
Add to Cart
CE Performance Thermal Shock Environmental Testing Equipment For Metal Plastics Rubber
Model:TS - 80-B (200 Deg C)
Technical Specifications:
Model | TS-42(A~C) | TS-80(A~C) | TS-150(A~C) | TS-252(A~C) | TS-450(A~C) | TS-900(A~C) | |
Internal Dimension WxHxD (mm) | 400x350x350 | 500x400x400 | 600x500x500 | 700x600x600 | 800x750x750 | 1000x900x900 | |
External Dimension WxHxD (mm) | 1400x1800x1400 | 1550x1950x1550 | 1600x2000x1700 | 1700x2100x1750 | 1800x2200x1900 | 2100x2400x2200 | |
Temperature Range of Testing zone | Type A:-40 ℃~+150℃ ( 200℃ is Optional) | Type B:-55℃ ~+150℃ ( 200℃ is Optional ) | Type C:-65℃ ~+150℃ ( 200℃ is Optional) | ||||
High temperature Range of Testing zone: +60ºC~+150ºC ( 200ºC is Optional); Low Temperature Range of Testing Zone: -10ºC~-40ºC / -55ºC / -65ºC | |||||||
Exposure Time of High/Low Temperature | Exposure Time of High Temperature: +60℃ ~ +150℃ (200℃ is Optional) 30Mins | ||||||
Exposure Time of Low Temperature : -10℃~Type A:-40℃ / Type B -55℃ / Type C -65℃ 30Mins | |||||||
Temperature of Heat-Storing Slot / Heating Time | RT~200℃/About 45mins | ||||||
Temperature of Cool-storing Slot / Cooling Time | RT~-75℃/ About 100mins | ||||||
Temperature Recovery Time / Conversion Time | ≤5min/≤5sec | ||||||
Control Accuracy / Distribution Uniformity | ±0.5℃/±2℃ | ||||||
Internal and External Material | Material of the inner box is SUS 304# stainless steel,of the outer box is stainless steel or see cold-rolled steel with paint coated. | ||||||
Insulation Material | High temperature resistant , high density , formate chlorine , ethyl acetum foam insulation materials | ||||||
Mechanics | P.I.D+S.S.R+ Micro-computer balanced temperature control system | ||||||
Cooling System | Semi-hermetic double-stage compressor(water-cooled type) /Hermetic double-stage compressor (air-cooled type) | ||||||
Security Protection Devices | Non-fuse breaker, high and low pressure protective switch of the compressor , refrigerator high-pressure protective switch , failure warning system, electronic alarm | ||||||
Accessories | viewing window(special order) | ||||||
Compressor | French 'Tecumseh' Brand, Germany Bizer Brand | ||||||
Power | AC220V 1∮ 3 lines ,50/60HZ, AC380V 3∮ 5 lines ,50/60HZ |
material:
1.Interior dimension : 400 X350 X 350 MM (W x H x D)
2.Exterior dimension:1400 X 1800 X 1400 MM (W x H x D)
3. Structure:high temperature zone, low temperature zone, testing zone
4. Internal material : SUS#304 hardy heat-resistant stainless steel
5. Outter shell material : SUS#304 SUS#304 hardy heat-resistant stainless steel
Thermal Shock Chamber Calibration Report Control system:
1 Touch Screen controller:
2 Temperature controller: Using imported 7 inches microcomputer colorful LCD touch screen, direct touch type, the wide viewing angle, high contrast features programmable controller, with 120 set of programs, each program has a 13,000 circulation English said each cycle longest running time has 99H59M, along with multiple sets of PID control functions.
3 Controller Specifications:
3.1: Accuracy: ± 0.1 Deg C+1digit.
3.2: Resolution: ± 0.1 Deg C
3.3: Temperature slope: 0.1~9.9 programable
3.4: Having upper and lower standby and alarm functions
3.5: With Signal: PT100
3.6: Group 9 P.I.D control parameter setting, P.I.D automatic calculation."
CE Aprpoved Programable Thermal Shock Chamber Calibration Report Saftey device:
5.1 Cooling System: Compressor heat loading or cold over loading warming
5.2 Testing room: Testing room and Humidifier temperature over loading warming.
5.3 Others: Leakage protection. Heating, dry protection. Overload, short circuit protection.Power protection.
Power: AC380V 3phase 5lines 50/60HZ
Standards comply with:
GB/T 2431.1-2001 Testing A: Low temperature testing method
GB/T 2431.2-2001 Testing B: High temperature testing method
GJB 150.3-1986: High temperature
GJB 150.4-1986: Low temperature
IEC68-2-1 Test A: Cold
IEC68-2-2 Test A: Dry
GB 11158 High and low temperature test term
GB/T 2423.2 << Electrolic products basic environmental test: B: high temperature method>>
CE Aprpoved Programable Thermal Shock Chamber Calibration Report
Machine structure:
(1) Structure: high-temperature storage area, cold storage areas, sample test area
(2) Out material: High grade stainless steel plate with white painting;
(3) Inner material: SUS304 stainless steel;
(4) Testing body heat preservation material: rigid polyurethane foam + fiberglass.
(5) Door insulation materials: rigid polyurethane foam + fiberglass.
2 Testing sample is put on sample shelve,the cylinder drive to open the valve of heat-storing zone or cooling-storing zone.
3 Guide cold air into testing zone, to achieve effect of fast cooling . Balance the temperature control system(BTC) + Special designed air circulation system, Cotrol S.S.R. by P.I.D. ,make the system's heating equal to heat consumption, so the machine can long-term stability using.
4 Air adjusting Channel: Centrifugal fan:
Stainless steel heater, aluminum wind round, sealed duct valves, temperature sensors."
5 The device test load: Means that the sample have no heat source, the sample size can not exceed 50% inside test volume , made of non-metallic products (which can be customized according to the user's specific sample)
Cooling system and temperature control:
1.Working way: Size selection for machine model; the cascade of mechanical refrigeration; water-cooling (users should prepare the cooling water tower)
2.Refrigeration Compressors: Imported famous brand low efficiency hermetic or semi-hermetic compressors.
3.Evaporator: Fin-type multi-stage automatic load capacity adjustment evaporator.
4.Condenser: Shell and tube heat dissipation condensation.
5. System expansion: Refrigeration system capacity control purposes
6. Cooled heat exchanger: Made in Taiwan ultra-high efficiency stainless steel plate.
7. Cooled machine control mode: Control system controller automatically adjusts the cooled operating conditions based on test conditions than the traditional design, control stability and reproducibility of high power and achieve effectiveness. Return air compressor cooling circuit
8. Refrigerant and refrigeration piping: R22, R-23, R404A, Environmental Protection; indices are zero ozone depletion refrigerant pipes have automatic and manual defrost function
1. Are your company a trading one or a factory?
Factory ,28 years focusing on test instruments field,4 years exporting experience.
2. After an order is placed, when to deliver?
Generally about 20 workdays, If we have finished products, we can arrange shipment within 3 workdays.
Please be aware that our production lead times depend on specific items and item quantities.
3. What about the warranty with after - sales services?
12 months warranty.
After the warranty, the professional after-sale service team will provide perfect technical support,and help customer solve problems encountered while using our product, handles guest problems and complaints in a professional and timely.
4. What about the services and product' quality?
Service: OEM service,Design service,Buyer lable service.
Quality: Each instruments must be carried out 100% quality examination and test, the finished products must through a third party calibration institutions before shipping and delivery goods.
5. How to install and training?
If the products is easy to install and training, customers can learn the operation and maintenance manual to installation and use.
If the products is hard to use, customers can come ASLi factory to learn how to installation and use. And our engineers have a passport, we can go to overseas.
6.What's your main products?
Environmental chambers, temperature (humidity) chamber, PCT /Hast chamber (Highly accelerated stress test chamber),ESS chamber, Walk in stability chamber,Vacuum oven,Altitude chamber,vibration test system, mechanical shock tester,environmental combined vibration chamber,etc.